3-Layer Polyethylene(3PE)Coated Pipe

3-Layer Polyethylene(3PE)Coated Pipe

Product Name: 3LPE Coated Pipe, 3PE Coating Pipe, Anti Corrosion Steel Pipe

Coating Type: 3 Layer Polyethylene

OD: 25 mm to 3000 mm

WT: SCH5S to SCH160, XXS

Length: Up to 12m

Connection: Weld And Thread

Standard: ANSI, JIS, DIN, EN, ISO,DIN;CAN/CSA,NFA

Product Description
Product Display
Product Application
Packaging and shipping

The industry-standard, high-performance external corrosion protection system for demanding environments.

Combines a Fusion Bonded Epoxy (FBE) primer, a copolymer adhesive layer, and an extruded Polyethylene (PE) top layer into one integrated system, offering unmatched adhesion, cathodic disbondment resistance, and mechanical strength.

图片1

Coating Structure & Function:

图片2

First Layer (Bottom Layer): Fusion Bonded Epoxy (FBE)

Function: Provides excellent long-term adhesion and cathodic disbondment resistance, chemically bonding with the steel pipe surface to form a strong corrosion protection foundation.


Second Layer (Intermediate Layer): Copolymer Adhesive

Function: Acts as a chemical bonding agent, securely joining the polar FBE bottom layer with the non-polar polyethylene top layer, ensuring system integrity.


Third Layer (Top Layer): Extruded Polyethylene (PE)

Function: Provides extra-thick mechanical protection against handling, backfilling, soil stress, rock impact, and moisture penetration.


Specifications:

ItemDetailed Parameters & Description
Coating Structure

Three-layer Composite:


Layer 1: Fusion-bonded epoxy powder (FBE), thickness >100 µm


Layer 2: Copolymer adhesive (AD), thickness 170 – 250 µm


Layer 3: Polyethylene (PE), thickness 2.5 – 3.7 mm (standard range)

Bare PipeMaterial Carbon Steel ( API 5L (PSL1, PSL2), GB/T 9711.1)
Type & Process(LSAW/SSAW),  (ERW), Seamless Cold Drawn,Hot Finished,Hot Expanded 
OD RangeΦ159 mm – Φ1220 mm (Up to 2020mm)
WT Range5 mm – 25 mm SCH10~SCH160  Or  STD,XS,XXS  Or  1.73mm~59.54mm
Length4m, 6m, 12m, 18m, 21m(or customized)
GradesGr. B, X42, X46, X52, X60, X65, X70, X80
InspectionHydrostatic pressure testing and non-destructive testing (such as ultrasonic testing UT) comply with API standards.
Materials & StandardsPipe Grade

API 5L (PSL1/PSL2, Gr.B, X42-X80), GB/T 9711.1

PSL1:API 5L – Gr.B/X42/X46/X52/X60/X70 etc.

PSL-2:ISO3183 – L245/L290/L320/L360/L415/L485 etc.
Coating Std.ISO 21809-1, DIN 30670, SY/T 0413-2002
CertificationThird-party inspections such as SGS and BV are acceptable.
Application
Designed for demanding environments, such as long-distance oil and gas pipelines, directional drilling crossings, rocky areas, subsea/river crossings, urban gas distribution networks, and critical water systems.
Advantage
Combining the superior adhesion of FBE with the top-tier mechanical protection of PE, it provides the longest-lasting corrosion protection.
Ends
Plain end, beveled end, threaded or socketed; end caps are available for protection.
Packing

Wrapped in waterproof paper, secured with steel straps, and each bundle is labeled.


3PE防腐钢管

  • Marine and Marine Engineering
  • VCG41N1294103185
    Petrochemical Industry
  • VCG211475367801
    Municipal Water Supply And Drainage
  • VCG211448584768
    Natural Gas Transportation
  • VCG41N1395455710
    Fire Protection
  • 能源电力行业
    Energy and Electricity
  • 微信图片_20260123145751_17897_32
  • 微信图片_20260123145749_17896_32
  • 微信图片_20260123145748_17895_32
  • 微信图片_20260123145804_17898_32

FAQ

1.What kind of customer service do you provide?

We provide comprehensive customer service, including basic design, procurement of supporting facilities, and options for dispatching installation guides.

 

2.What are the customer evaluations of your company?

We are proud to consistently receive five-star reviews from our customers, which demonstrates our commitment to quality and service.

 

3.What is your quality inspection process like?

Our strict quality inspection process ensures that every product meets the highest standards of excellence. From raw materials to finished products, every stage is carefully inspected to ensure excellent quality.

 

4.Do you accept container loading inspection?

Welcome to dispatch inspectors, not only for container loading, but also at any time during production.

 

 

5.What is the delivery time?

The delivery time depends on the quantity of orders. Usually, the delivery time to the nearest port in China is 15-30 days after receiving the deposit.

 

6. How to obtain a project quotation?

You can contact us 24 * 7 via email, phone, WhatsApp, WeChat, etc. You will receive a reply within 4 hours.

Inquiry Online

Submit

Product recommendation