Valves

Valves

Opening and closing, throttling, preventing backflow, and regulating flow.

Pressure-temperature rating, end connection type (butt weld/flange), valve body/internal parts material (for corrosive media), operating method.

API 600/602/6D
ASME B16.34
GB/T 12224

Product Description
Product Display
Product Application
Packaging and shipping

Parameter CategorySpecific Parameter ItemDetailed Description/Optional Range
Basic ParametersValve TypeGate valve, Globe valve, Ball valve, Check valve, Butterfly valve
Execution StandardInternational Standards: API 600, API 602, API 6D, ASME B16.34; National Standard: GB/T 12224 (General Requirements for Steel Valves)
Functional ParametersCore Functions1. On-off function: Control the on-off of the medium path to adapt to the start and stop of medium transportation under various working conditions; 2. Throttling function: Adjust the medium flow to achieve precise control; 3. Backflow prevention function: Prevent reverse flow of medium to avoid equipment failure and working condition disorder; 4. Flow regulation function: Adapt to changes in working conditions and stably control the medium transportation rate to ensure system operation stability.

拼图_美图设计室

  • Marine and Marine Engineering
  • VCG41N1294103185
    Petrochemical Industry
  • VCG211475367801
    Municipal Water Supply And Drainage
  • VCG211448584768
    Natural Gas Transportation
  • VCG41N1395455710
    Fire Protection
  • 能源电力行业
    Energy and Electricity
  • 微信图片_20260123145751_17897_32
  • 微信图片_20260123145749_17896_32
  • 微信图片_20260123145748_17895_32
  • 微信图片_20260123145804_17898_32

FAQ

1.What kind of customer service do you provide?

We provide comprehensive customer service, including basic design, procurement of supporting facilities, and options for dispatching installation guides.

 

2.What are the customer evaluations of your company?

We are proud to consistently receive five-star reviews from our customers, which demonstrates our commitment to quality and service.

 

3.What is your quality inspection process like?

Our strict quality inspection process ensures that every product meets the highest standards of excellence. From raw materials to finished products, every stage is carefully inspected to ensure excellent quality.

 

4.Do you accept container loading inspection?

Welcome to dispatch inspectors, not only for container loading, but also at any time during production.

 

 

5.What is the delivery time?

The delivery time depends on the quantity of orders. Usually, the delivery time to the nearest port in China is 15-30 days after receiving the deposit.

 

6. How to obtain a project quotation?

You can contact us 24 * 7 via email, phone, WhatsApp, WeChat, etc. You will receive a reply within 4 hours.

Inquiry Online

Submit

Product recommendation